How Push-Pull Self-Locking Circular Connectors Revolutionize Industrial Connectivity?

Industry Pain Points: 3 Major Failure Modes:

Core Value Proposition:

Application Scenarios:

Why Choose Hecon?

FAQ

Industry Pain Points: 3 Major Failure Modes:

1.             Vibration-Induced Disconnection - 73% equipment downtime caused by poor contacts
2.             Environmental Contamination - IP54 connectors fail within 6 months in harsh conditions
3.             Maintenance Complexity - 40% longer service time with threaded connectors

Core Value Proposition:

✅ Military-Grade Reliability
IP68/IP69K certified, 2000+ mating cycles tested, -40℃~+125℃ operational range

✅ Intuitive Locking Mechanism
Patented push-pull design features:
1.           0.3s mating/demating
2.           Tactile/audible confirmation
3.           50N axial force resistance

✅ Full-Scale Solutions
M5/M8/M12/M16/M23 series with:
1.           Hybrid power/signal transmission
2.           Ethernet/PoE compatibility
3.           Stainless steel/engineering plastic options

✅ Custom Cable Assembly
Turnkey services including:
1.           UL/CE certified cables
2.           Oil/chemical resistant jackets
3.           Color-coding/labeling systems

Application Scenarios:

1.           Cobots - Joint module power supply
2.           Energy Storage - Outdoor combiner box wiring
3.           Medical Imaging - CT gantry slip ring alternative
4.           Rail Transit - Vibration-proof vehicle connections

Why Choose Hecon?

1.           15 years of connector R&D and OEM experience
2.           ISO 9001:2015 certified, 500,000 monthly capacity
3.           Free samples & technical consultation
4.           On-time and fast delivery

FAQ

Q1: What is your MOQ?
MOQ is 100pcs.
Q2: Can we get free samples?
Yes, We can provide free 3-10pcs samples but freight collect and customized part you need pay samples cost.
Q3: What is samples lead time?
Standard samples delivery date about 3-5 days and customized samples need about 7 -10 working day.
Q4: What is your mass production delivery date?
2-3 weeks once confirm your order.

 

none